How to tile a bathroom floor
Prepare the subfloor, lay out and set the tile, then grout and finish your bathroom floor.
This guide covers the floor outside the tub or shower, not a tiled shower pan. Give yourself time between steps for the mortar, grout, and any sealer to cure.
Calculators for this job
Tools
- Pry bar and floor scraper
- Tape measure, chalk line, and straightedge
- Notched trowel, bucket, and mixing paddle
- Tile cutter or wet saw
- Grout float, sponge, and spacers
Materials
- Floor-rated tile
- Tile backer board or uncoupling membrane
- Compatible thinset mortar and grout
- Floor patch or leveler and primer if needed
- Flexible sealant, threshold, and grout sealer if required
Steps
Remove the old floor
Take off the baseboards and threshold, and remove the toilet if the tile will run under it. Shut off the toilet's water first and plug the drain with a removable plug. Pull up the old flooring and scrape away loose material without gouging the subfloor.
Check the subfloor
Look for soft spots, water damage, loose panels, and bounce underfoot. Fix leaks and repair damaged or loose areas before covering them. Check for high and low spots with a long straightedge, and use a compatible patch or leveler where needed.
Prepare the tile base
Over a suitable wood subfloor, install backer board or an uncoupling membrane according to its instructions. Over sound concrete, check that the slab is clean and ready for your tile system. Check the finished floor height at the doorway and toilet flange before setting tile.
Dry-lay the tile
Snap two square chalk lines through the center and dry-lay a row along each line with spacers. Shift the layout if it leaves skinny cuts at a wall, tub, or doorway. Check the view from the doorway before marking your final starting lines.
Set the full tiles
Mix small batches of thinset and comb it in one direction with the recommended notched trowel. Press each tile into the ridges with a short sideways slide, using spacers to keep the joints even. Lift the first tile to check coverage and scrape out mortar that squeezes into the joints before it hardens.
Cut and set the edge pieces
Measure each cut separately, allowing for the grout joint and the perimeter movement gap your tile system calls for. Use a tile cutter for straight cuts and a wet saw for notches when appropriate. Leave movement gaps free of mortar and grout.
Let the tile set
Stay off the floor until the mortar says it can take foot traffic. Wait until the mortar is ready for grout, often at least 24 hours, and follow the bag if it calls for longer. Pull out the spacers and clear loose mortar from the joints.
Grout the joints
Press grout into the joints with a rubber float held diagonally across the tile. When the grout is ready for cleanup, wipe it with a damp, well-wrung sponge and rinse often. Use compatible flexible sealant rather than grout in movement joints where the tile meets the tub or other fixed surfaces.
Seal and finish
Let the grout cure as directed, then apply a sealer if the grout or tile maker calls for one. Refit the trim and threshold, and reinstall the toilet with a new seal if you removed it. Follow the product instructions before putting the floor back into regular use or getting it wet.
Tips
- Buy about 10% extra tile for a straight layout, and keep a few matching pieces for repairs.
- Run a straightedge across neighboring tiles as you go. Correct lippage (a raised edge you can feel) while the mortar is still soft.
- Check the mortar, grout, and sealant labels separately for cure times. Cool or humid conditions can slow drying.
Safety
- Wear knee pads and safety glasses, and follow the saw maker's safety instructions.
- Wet-cut tile to control silica dust. Wear a properly fitted respirator rated for the dust when cutting or mixing creates dust, and avoid dry sweeping it.
- Ventilate the room while mixing products and using sealants. If you suspect old flooring or adhesive contains asbestos, stop and have it checked before disturbing it.