Refresh an existing deck with new boards, railing, and stain if the framing is still sound. This guide does not cover building a new deck frame.
Check the frame before you pull up a board. Plan to keep the deck closed until the new railing is secure, and give new wood time to dry before staining.
Calculators for this job
Tools
- Pry bar and drill or impact driver
- Tape measure, chalk line, and square
- Circular saw and sawhorses
- Level and spacing blocks
- Brush or pad for stain
Materials
- Exterior-rated deck boards
- Joist tape
- Deck screws or compatible hidden fasteners
- Railing posts, rails, balusters, and approved connectors
- Exterior deck stain for wood boards
Steps
Inspect the frame first
From a safe spot, look for soft or rotted joists or posts, a loose ledger board where the deck meets the house, and rusted hangers or post hardware. If anything is loose, damaged, or hard to assess, stay off the deck and call a qualified pro. If the frame needs work, check with the building department and get any required permit before work starts.
Remove the old railing and boards
Block access from the house and stairs, and protect any open edge with a secure temporary guard before removing the old railing. Unscrew or pry up the old boards without damaging the joists. Work from a stable surface and pull or safely remove exposed fasteners as you go.
Apply joist tape
Check the exposed framing again for damage that was hidden by the boards. If it is sound, clear off debris and let the joist tops dry. Press joist tape onto each top surface as directed so water stays out of the fastener holes.
Lay out the boards
Start from a straight reference line and check the width of the last row before fastening. Stagger the end joints between rows and make sure each board end lands on a joist with enough support and room to fasten it. Follow the board maker's instructions for supporting butt joints.
Space and fasten the boards
Use spacers to leave even drainage gaps as you work. Check the recommended gaps for your board material and, for wood, its moisture level. Use two approved face screws per board at each joist, or use the compatible hidden-fastener system as directed.
Trim the ends straight
Snap a chalk line across the board ends at the finished edge. Check that the cut is clear of fasteners and framing, then set the circular saw blade just deep enough to cut through the decking. Make the cut from a stable position without reaching over the edge.
Install the railing posts and rails
Set the posts plumb and attach them to the framing with the connectors and blocking required by the railing system and local code. Do not attach guard posts to the deck boards alone. Set the rails to the required height and secure them as directed.
Space and fasten the balusters
Mark the layout before fastening so both end gaps look even. Use a spacer to keep the clear gaps under 4 inches, including next to the posts, or smaller if local code requires it. Ask the building department about stair and bottom openings, and keep the deck closed until the whole railing is secure.
Stain the wood when it is ready
Clean the wood and wait until it meets the stain maker's moisture and weather requirements. Apply exterior deck stain as directed and let it dry before walking on it. Skip staining composite boards unless their maker calls for it.
Tips
- Check the required railing height and baluster spacing with your local building department before buying materials.
- Pre-drill near board ends as directed to avoid splitting the wood.
- For composite decking, use the matching screws from the same fastener brand and system, and check that the decking maker approves them for your boards.
Safety
- Inspect the frame before doing anything else. Do not stand on or under a deck you suspect is unsafe.
- Wear eye protection when prying, drilling, or cutting, and gloves when handling rough boards. Follow the saw maker's instructions and keep your hands clear of the blade.
- Never leave a deck edge unguarded where there is a drop. Use a secure temporary guard until the permanent railing is complete, and keep others off the deck during the work.