How to paint a room

Prep the walls, roll on an even coat, and finish the trim without drips or lap marks.

About 1 to 2 days Easy

This guide covers painting interior walls and trim. Plan on one to two days, and check the labels before you start so you can leave enough time for patches, primer, and paint to dry.

Start this project

Calculators for this job

Tools

  • Screwdriver and putty knife
  • Sanding sponge and cleaning cloths
  • Angled brush, roller, and paint tray
  • Roller extension pole and stepladder
  • Caulk gun

Materials

  • Canvas drop cloths and furniture covers
  • Painter's tape
  • Spackling compound and paintable caulk
  • Primer as needed
  • Interior wall paint and trim paint

Steps

  1. Clear and cover the room

    Move small furniture out and pull larger pieces into the center. Cover the furniture and protect the whole floor with drop cloths, securing the edges so they don't shift.

  2. Remove outlet and switch covers

    Turn off power at the breaker and verify it's off before removing the covers. Keep the plates and screws together, and don't loosen the devices or touch any wiring. Keep the power off while the plates are off, and use a work light if needed.

  3. Fill holes and sand smooth

    Check for lead paint before sanding in a home built before 1978. Fill small nail holes with spackle and scrape off the extra with a putty knife. Let the patches dry, then sand them flush and wipe away the dust.

  4. Clean the walls

    Wipe down the walls and trim with a damp cloth and mild cleaner, especially around switches and other spots people touch. Remove any cleaner residue with a clean damp cloth and let the surfaces dry.

  5. Caulk gaps and apply tape

    Run a thin bead of paintable caulk along small gaps between the trim and wall, then smooth it and let it dry as directed. Tape off surfaces you don't want painted. Press the tape edge down firmly so paint doesn't seep underneath.

  6. Prime where needed

    Spot-prime patches and use drywall primer on bare drywall. Use a stain-blocking primer on stains after fixing their source, and consider a tinted primer for a big color change. Let the primer dry according to the label.

  7. Cut in and roll the first coat

    Use an angled brush to paint a 2 to 3 inch band along corners, the ceiling, and trim. Cut in one wall at a time, then roll it in sections about 3 feet wide while the brushed edge is still wet. Overlap each fresh section with the last while it's still wet to avoid lap marks.

  8. Roll on the second coat

    Wait at least the recoat time on the can, even if the wall feels dry to the touch. Cut in and roll the second coat the same way, keeping a wet edge and working in good light so you can spot missed areas.

  9. Paint the trim

    Once the walls are dry enough to tape, use tape made for delicate surfaces or cut in by hand. Brush on thin coats of trim paint and check the corners for drips. Follow the trim paint's recoat time if you need another coat.

  10. Pull the tape and clean up

    Follow the tape maker's removal timing and pull the tape back over itself slowly. If dry paint bridges the edge, lightly score the paint line first so it doesn't peel. Once the paint around the outlets and switches is dry, reinstall the covers before restoring power, then wash the tools as directed and fold up the drop cloths.

Tips

  • If you're painting all three, work from the top down: ceiling first, then walls, then trim.
  • Pour matching gallons into a clean 5 gallon bucket and stir them together for even color. Painters call this boxing the paint.
  • For a short break between coats, wrap the roller cover tightly in plastic instead of washing it. Unwrap it just before you roll again.
  • Flat paint hides flaws on ceilings, and eggshell works well in living rooms and bedrooms. Try washable satin in kitchens and baths and semi-gloss on trim.

Safety

  • Open windows and ventilate to the outdoors while painting and drying. Follow the label's ventilation instructions.
  • Set the stepladder on a level, dry floor and lock it open. Don't stand on the top step or lean out to reach; climb down and move it.
  • In homes built before 1978, test for lead paint before sanding or scraping. If lead is found, don't dry-sand it; use lead-safe methods or hire a lead-safe certified contractor.

Estimates only. Check quantities with your supplier before you buy. © 2026 HouseCalcs