How to install a floating floor
Prepare the subfloor and install click-lock laminate or luxury vinyl plank (LVP) without fastening the planks down.
This guide covers click-lock planks that float over the subfloor, not glue-down flooring. Allow extra time if your planks need to acclimate or your floor patch needs to dry.
Calculators for this job
Tools
- Pry bar and utility knife
- Tape measure, square, and long straightedge
- Undercut saw and jigsaw or plank cutter
- Spacers, tapping block, and pull bar
- Hammer or finish nailer
Materials
- Click-lock laminate or luxury vinyl planks
- Compatible floor patch or leveler and primer if needed
- Underlayment or vapor barrier if required
- Matching transition strips
- Baseboard or quarter round and finish nails
Steps
Let the planks acclimate
Bring the planks into the room and follow the flooring maker's instructions for how long to leave them there, how to stack the boxes, and what temperature to keep the room. Some products don't need this wait.
Remove the trim
Score the paint or caulk along the top of the baseboard or quarter round, then pry the trim off gently so you can reuse it. Label each piece as you go so it goes back in the same spot. Stop before disturbing any old sheet vinyl or adhesive that may contain asbestos.
Check and level the subfloor
Use a long straightedge to find high and low spots and compare them with the flooring maker's flatness limit. Fix leaks or loose panels, and check moisture as directed for your subfloor. Fill low spots with a compatible patch or leveler and let it dry before covering it.
Undercut the door casings
Set a scrap plank on a piece of the required underlayment, if any, and use the stack to mark the cut height. Trim the bottom of the door casing so the plank can slide underneath while still leaving the required gap behind the casing.
Lay the required underlayment or barrier
Use only the underlayment or vapor barrier your product calls for, and overlap or tape the seams as directed. Don't add a second cushion under planks with an attached pad unless the flooring maker allows it.
Plan the first and last rows
Measure across the room in inches, subtract the expansion gaps at both walls, and divide by the width one plank covers. If that leaves a narrow last row, cut some width off the first row so both edge rows are wider. Check the layout at both ends of the room in case the walls aren't parallel.
Start the first row with spacers
Set expansion spacers between the planks and the starting and end walls. Face the locking edges the way the instructions show and click the ends together. Keep the row straight and cut the last plank to leave room for the end spacer.
Stagger the joints and cut around openings
Keep end joints in neighboring rows at least as far apart as the maker requires. Reuse a cutoff to start a row only if it's long enough and keeps the joints staggered. Measure and notch planks at doorways and vents, leaving the required gap around fixed edges without blocking the vent.
Finish the transitions
Fit the last row with the required gap, then remove the spacers. Install transitions where the flooring maker calls for them, such as at doorways or where the floor meets a different surface. Attach the track or strip as directed without fastening through or pinching the floating planks.
Put the trim back
Cover the expansion gap without pressing the trim down against the planks. Nail baseboard into the wall and quarter round into the baseboard, never through the floor.
Tips
- Mix planks from several boxes as you work so color and pattern changes don't bunch up in one spot.
- Check the product instructions for the exact expansion gap. Some floors call for 1/4 inch, but the required gap can vary by product and room size.
- Keep a few spare planks from the same batch for future repairs.
Safety
- Wear knee pads while laying planks and safety glasses when cutting.
- Wear a well-fitting dust mask rated for the cutting dust, such as an N95 for ordinary sawdust, and cut outdoors or use dust extraction when possible.
- In older homes, stop and have old sheet vinyl or adhesive tested for asbestos by a qualified professional before cutting, sanding, scraping, or pulling it up.